CyberMax
Home

Orbital data center tracker

Who is putting AI compute in orbit, on what hardware, and when. Tracker verified 30 Sep 2026 · launches updated 30 Sep 2026 · orbits updated 30 Sep 2026.

Next orbital-compute launch

Transporter 18 (Dedicated SSO Rideshare)

–days–hours–min–sec

NET 2026-10-01 18:18 UTC · Falcon 9 Block 5 · Vandenberg SFB, CA, USA · status: Go for Launch (The Space Devs Launch Library 2, 30 Sep 2026).

On board: Google's Project Suncatcher (4 Google Trillium-generation TPUs).

14projects11companies3with hardware in orbit13satellites with live orbits

Every tracked project

Status, hardware and dates as the sources state them; blank means nobody has published it. Numbers in the last column are the sources.

CompanyProjectHardwareLaunchStatusFunding (public)Sources
GoogleProject Suncatcher: first TPU prototype satellite4 Google Trillium-generation TPUs1 Oct 2026 (Transporter-18, window opens 18:18 UTC)scheduled–[1] [2] [3]
GoogleProject Suncatcher: two prototype satellites with cross-linksGoogle TPUs (per satellite count not stated)early 2027 (target)planned–[1] [2]
StarcloudStarcloud-11 NVIDIA H100 GPU2 Nov 2025in orbit$170M Series A at a $1.1B valuation (Mar 2026), led by Benchmark with EQT Ventures[1] [2] [3]
StarcloudStarcloud-2–later in 2026 (company, Mar 2026)planned$170M Series A at a $1.1B valuation (Mar 2026)[1]
CrusoeCrusoe Cloud on a Starcloud satellite–late 2026 (planned); GPU capacity from orbit by early 2027planned–[1]
SpaceX (with xAI)Orbital data center constellation (FCC SAT-LOA-20260108-00016)–FCC application filed 30 Jan 2026filed–[1] [2]
Blue OriginProject Sunrise–FCC application filed March 2026filed–[1]
Axiom SpaceOrbital data center nodes (first two)commercial off-the-shelf compute with 2.5 Gbps optical links11 Jan 2026in orbit–[1]
Axiom SpaceData Center Unit-1 (AxDCU-1) on the ISSRed Hat Device Edge compute unitfall 2025 (deployed to the ISS)deployed–[1]
ADA Space and Zhejiang LabThree-Body Computing Constellation (first 12 satellites)on-board AI processors (per-satellite specs not in source)14 May 2025in orbit–[1] [2]
AetherfluxGalactic Brainsolar-powered AI compute satellite (GPU details not stated)Q1 2027 (target)announced–[1]
Lonestar Data HoldingsFreedom lunar data center payload (IM-2)small data center payload with Phison storage27 Feb 2025 00:16 UTC (IM-2)flown–[1] [2]
Sophia SpaceTILE orbital computing modulestile-shaped satellite compute modules with integrated solar power and radiative cooling–development$10M seed (Feb 2026)[1]
NVIDIAVera Rubin Space-1 ModuleVera Rubin Space-1 Module for orbital data centersannounced 16 Mar 2026 (GTC); availability not statedannounced–[1]

Orbits of the compute satellites

CelesTrak GP elements for every tracked satellite with a public NORAD ID; new satellites appear here once CelesTrak lists them.

ObjectNORADPerigee × apogeeInclinationPeriodEpoch
STARCLOUD-166303495 × 503 km45.4°94.6 min2026-09-30
SCS-01 A63982485 × 520 km97.4°94.7 min2026-09-30
SCS-01 B63983429 × 438 km97.4°93.2 min2026-09-30
SCS-01 C63984484 × 521 km97.4°94.7 min2026-09-30
SCS-01 D63985485 × 491 km97.4°94.4 min2026-09-30
SCS-01 E63986497 × 508 km97.4°94.7 min2026-09-30
SCS-01 F63987498 × 506 km97.4°94.7 min2026-09-30
SCS-01 G63988476 × 491 km97.4°94.3 min2026-09-30
SCS-01 H63989438 × 446 km97.4°93.4 min2026-09-30
SCS-01 J63990487 × 494 km97.4°94.4 min2026-09-30
SCS-01 K63991497 × 508 km97.4°94.7 min2026-09-30
SCS-01 L63992498 × 507 km97.4°94.7 min2026-09-30
SCS-01 M63993477 × 482 km97.4°94.2 min2026-09-30

Upcoming rideshare and compute launches

NETMissionProviderRocketStatusFlag
2026-10-01Transporter 18 (Dedicated SSO Rideshare)SpaceXFalcon 9 Block 5Gocompute
2026-10-31Bandwagon 5 (Dedicated Mid-Inclination Rideshare)SpaceXFalcon 9 Block 5TBDrideshare
2026-12-31VICTUS SURGOSpaceXFalcon 9 Block 5TBDrideshare
2027-02-28Transporter 19 (Dedicated SSO Rideshare)SpaceXFalcon 9 Block 5TBDrideshare
2027-03-31Nova-C IM-3SpaceXFalcon 9 Block 5TBDrideshare
2027-04-30Bandwagon 6 (Dedicated Mid-Inclination Rideshare)SpaceXFalcon 9 Block 5TBDrideshare
2027-06-30Transporter 20 (Dedicated SSO Rideshare)SpaceXFalcon 9 Block 5TBDrideshare
2027-10-31Transporter 21 (Dedicated SSO Rideshare)SpaceXFalcon 9 Block 5TBDrideshare
2027-12-31Exolaunch Exo-1SpaceXFalcon 9 Block 5TBDrideshare

FAQ

What is Google's Project Suncatcher?

A Google research moonshot exploring solar-powered satellites with TPU AI chips. Its first prototype carries 4 Google Trillium-generation TPUs and is scheduled for 1 Oct 2026 (Transporter-18, window opens 18:18 UTC), developed with Planet; two more prototype satellites with cross-links target early 2027. Sources: blog.google (24 Sep 2026), Planet (4 Nov 2025).

Is there already an AI data center in orbit?

Small ones. Starcloud-1 (1 NVIDIA H100 GPU, launched 2 Nov 2025) is in orbit as NORAD 66303; Axiom Space's first two orbital data center nodes launched 11 Jan 2026; China's Three-Body Computing Constellation put its first 12 computing satellites up on 14 May 2025. 3 tracked projects have hardware in orbit today.

Which companies are building orbital data centers?

Tracked here: ADA Space and Zhejiang Lab, Aetherflux, Axiom Space, Blue Origin, Crusoe, Google, Lonestar Data Holdings, NVIDIA, Sophia Space, SpaceX (with xAI), Starcloud. Each row links the company page or news report it comes from.

Where does this data come from?

Company pages and reputable news for the tracker (linked per row, unknown values left blank), The Space Devs Launch Library 2 for launches, CelesTrak for orbit elements. Refreshed daily by CyberMax. Company names identify projects only; no affiliation or endorsement is implied.

Independent tracker by CyberMax. Company and project names are used only to identify what is tracked; no affiliation with or endorsement by Google, Planet, SpaceX, xAI, Starcloud, Blue Origin, Axiom Space or any other company listed. Launch data: The Space Devs Launch Library 2. Orbit elements: CelesTrak.